Aerial, duct and direct-burial runs load an outdoor cable differently. Sunlight, standing water, soil contact and span tension each call for a different jacket, armour or messenger. This article compares the three constructions and the site conditions that decide which one holds up.

By WEIHUI CablesUpdated
  • Installation
Outdoor Network Cable Constructions: Aerial, Duct and Direct Burial

Why the Route Decides the Construction

Sunlight, standing water, soil, vehicle loading and span load all act on the cable from the outside. The category sets the transmission performance of the copper; it says nothing about whether the cable survives the route it is installed on.

That is why an outdoor quotation normally starts from the route and the conditions around it rather than from a catalogue part number. Two projects in the same city can share the same Cat6 conductor and need completely different jackets and cores.

Aerial Spans

An aerial run goes pole to pole, or pole to building. Supply it with an integrated messenger where the span is self-supporting; supply it without one where it will be lashed to an existing support.

Three things decide the construction: span length, the sag the route allows, and how much permanent sunlight the jacket will face. The jacket carries a UV-stabilized PE layer where the run sits in permanent sun, and its tensile strength is matched to the span and the sag allowed. A cable that carries its own weight is a different product from one laid inside a duct.

Duct and Conduit

A ducted route is the most protected option. The cable is pulled through an underground duct, pipe or trenchless crossing, so it never touches the soil and can be replaced without reopening the whole route.

Protected from soil is not the same as protected from water: ducts hold standing water and condensation. On long pulls the limits stop being sunlight or rodent damage and become pull tension and bend radius. The usual build is a PE jacket over a water-blocked core.

Direct Burial

Buried directly in a trench with no duct around it, the cable carries all of its own protection. It is normally specified with a water-blocked or gel-filled core, and with armor wherever soil, stone or vehicle loading can reach it. Burial depth, soil conditions and the other services sharing the trench are confirmed against the project drawings before the reel is cut.

Building Entry and Indoor Handover

Most outdoor runs finish at a building. The entry point is where outside plant cable hands over to the indoor network, and it is also where the two product families stop being interchangeable.

Outdoor PE jackets are not rated for flame and smoke the way indoor jackets are. In riser and plenum spaces indoor-rated cable is used instead, even though an outdoor construction will physically be run indoors.

Construction Options at a Glance

Route, exposure and the construction that normally follows
Route What It Has To Survive Typical Construction
Aerial span Span load, wind, permanent sunlight UV-stabilized PE jacket with integrated messenger, or a lashing support
Duct or conduit Standing water, condensation, pull tension PE jacket with a water-blocked core
Direct burial Soil, stone, rodent and vehicle loading Water-blocked or gel-filled core, armor where required
Building entry Handover to the indoor network Outdoor construction to the entry point, indoor-rated cable inside

What to Send with an Outdoor Cable Enquiry

A quotation can be built from a short list of details, and none of them need to be final. The route is the most useful input, because it narrows the construction faster than anything else you can send.

  • Installation route – aerial, duct, direct burial or building exterior
  • Cable category and the link speed the project has to carry
  • Any construction you have already specified, or the conditions we should design against
  • Total metres required and the reel length you want to pull from
  • Destination market, so certificates, test reports and packaging match your market or tender

Sources and standards

The constructions and performance figures above follow the published cabling standards, including ISO/IEC 11801 and ANSI/TIA-568. The links below point to the bodies that maintain the testing and safety requirements quoted here:

  • IEEE 802.3 — Ethernet: the working group defining the Ethernet physical layers and the categories built on them.
  • IEEE 802.3bt — Power over Ethernet: the amendment behind the higher-power PoE types that set conductor and bundle requirements.
  • IEC: publisher of the flame-retardant cable test families such as IEC 60332 that jacket ratings refer to.
  • EU RoHS Directive: the hazardous-substances restrictions that apply to cable compounds sold into the EU.
  • Fluke Networks: the field testers and reference material used for copper cabling certification.

Need the Right Cable Specification for Your Project?

Send us your required category, shielding, conductor, jacket, quantity, packaging, or target specification. Our team can help match the cable construction to your project requirements.

Our export team replies within 24 hours with pricing, lead time, and sample options.